8. Siding (Cladding)

Always remember the first piece is the most important. Start your siding package from the bottom and slowly work up checking every 6th board is level.

Materials Used:

21mm | 3/4" horizontal wood siding, fixings.

You will find the DIY instruction under product page to get more detailed instructions with all the measurements.

No items found.